More questions? Download a copy of the Danforth Foundation's Report to the Mayor for a full description of the findings. For an abridged version, take a look at the PowerPoint presentation.
Riverfront Development and the Arch Connector:
A Report to the Mayor
Prepared by: The Danforth Foundation 2007
Download the Report below:
-
Download Adobe PDF File
813 KB (Adobe Acrobat Required, free download)
-
Download Microsoft Powerpoint File
4.4 MB
Click here to view the Appendix to the Danforth Foundation Report
- Appendix A - Great Rivers Greenway District St. Louis Riverfront Master Plan Request for Qualifications (133 KB PDF)
- Appendix B - Great Rivers Greenway St. Louis Riverfront Master Plan Public Forum 1 Presentation (3.3 MB PDF)
- Appendix C - Great Rivers Greenway St. Louis Riverfront Master Plan Public Forum 2 Presentation (5.1 MB PDF)
- Appendix D - St. Louis Riverfront Master Plan Terraces & Islands 3D Design Images (280 KB PDF)
- Appendix E - St. Louis Riverfront Master Plan Terraces & Islands Site Plan - Aerial Views (1.5 MB PDF)
- Appendix F - St. Louis Riverfront Master Plan Terraces & Islands Program Diagram (140 KB PDF)
- Appendix G - Floating Islands in the Mississippi River - Computational Fluid Dynamics (CFD) Hydrodynamic Simulations (2.5 MB PDF)
- Appendix H - St. Louis Downtown Riverfront Tow Simulator Observations (8.8 MB PDF)
- Appendix I - Permitting Analysis: City of St. Louis Downtown Riverfront Study (8 MB PDF)
- Appendix J - St. Louis Riverfront Master Plan US Army Corps of Engineers Correspondence Regarding Drift (3.8 MB PDF)
- Appendix K - St. Louis Riverfront Master Plan Design Team Response to Questions for Go/No Go Decision (4.4 MB PDF)
- Appendix L - USACE Edited Response to the St. Louis Riverfront Master Plan Design Team Response to Questions for Go/No Go Decision (1 MB PDF)
- Appendix M - Land-Based Option - Initial Feasibility Report (2.5 MB PDF)
- Appendix N - Banks & Terraces Steering Committee Design Presentation Feb. 2007 (13.9 MB PPT)
- Appendix O - Banks & Terraces Final Design Concept Report (8.8 MB PDF)
- Appendix P - Phase 1 Final Report: Recommended Development Program for the St. Louis Riverfront Site (2.2 MB PDF)
- Appendix Q - Phase 2 Financial Analysis and Economic Impact Analysis for the Proposed St. Louis Central Riverfront Complex (248 KB PDF)
- Appendix R - Great Rivers Greenway District St. Louis Riverfront Master Plan Updates (96 KB PDF)
- Appendix S - Arch Grounds Connector Existing Condition Structural Documents (2.6 MB PDF)
- Appendix T - Arch Grounds Connector Project Engineering Request for Proposals (592 KB PDF)
- Appendix U - Designer RFQ (2.6 MB PDF)
- Appendix V - Deliverable 1: Report on Current Status of Infrastructure (3.7 MB PDF)
- Appendix W - Deliverable 2: Summary of Structural Alternatives, Tunnel Considerations and Cost Analysis (2 MB PDF)
- Appendix X - Arch Grounds Connector Design Process Brainstorm Sketches (17.9 MB PPT)
- Appendix Y - Arch Grounds Connector Federal Highway Administration Design Exception Correspondence (208 KB PDF)
- Appendix Z - Luther Ely Smith Square Kiosk Feasibility Report (328 KB PDF)
- Appendix AA - Arch Grounds Connector Final Architectural Illustrations (1MB PDF)
- Appendix BB - Danforth Foundation Riverfront and Connector Public Opinion Report - September 2005 (616 KB PDF)

